RSHP

MK Gateway

项目主持人
Andrew Partridge

项目主持人
Andrew Partridge

项目介绍
English
Français

项目介绍
English
Français

日期
2020 - ongoing

地点
Milton Keynes, UK

层数
32 + 2-storey podium

楼高
Tower 104.3m / 342.19ft

简介

MK Gateway is a mixed-use scheme, combining homes, workspace, shops, and an enhanced public realm at the centre of Milton Keynes.

The scheme’s three buildings – known as ‘Saxon Court’, ‘The Shed’ and ‘The Village’ – are set within a diverse public realm focussed on a new public square and landscaped green spaces that will serve as a new meeting point in the heart of the city. The project will be designed to support Milton Keynes’ target to be a net-zero carbon city by 2030.

Saxon Court, which was one of the city’s first office buildings, will be repurposed to provide a mix of offices, flexible workspaces, local independent retail, and community spaces.

An extension of three levels will be added to the top and the existing atrium will be enhanced as an active and publicly accessible indoor space, linking the original entrance to a new outdoor public green. At ground level there will be public amenities including cafes, a community space and cycle parking.

The Village will be a 32-storey gateway tower, plus a 2-storey podium, featuring triple-height community sky gardens which divide the tower into villages, enabling residents to enjoy outdoor space and engage with their neighbours. At street level there will be an active frontage of shared amenities and services.

The Shed will be a three-storey incubator building, designed to meet the need for affordable workspace. The roof extends beyond the facade line on the west side, to generate an exterior canopy over the pedestrian access between the building and the residential tower.

项目资料

团队
Dylan Davies, Mariana Garza, Lennart Grut, Bonnie Han, Ivan Harbour, Katherine Hegab, John Kennedy, Alex Kitching, Steve Martin, Ann Miller, Dawid Panek, Joseph Park, Andrew Partridge, Joanna Pencakowski, James Scrace, Stephanie Sinden, Maria Taboada, Jai Watts, Daniela Yaneva

项目主持人
Andrew Partridge

项目介绍
English
Français

项目主持人
Andrew Partridge

项目介绍
English
Français

日期
2020 - ongoing

地点
Milton Keynes, UK

Site Area
10 712.33 m²

层数
32 + 2-storey podium

Services Engineer
MTT Ltd

Structural Engineer
Meinhardt (UK) Ltd

Fire Consultant
The Fire Surgery

Landscape Consultant
Spacehub

Lighting Consultant
Speirs Major

团队

团队
Dylan Davies, Mariana Garza, Lennart Grut, Bonnie Han, Ivan Harbour, Katherine Hegab, John Kennedy, Alex Kitching, Steve Martin, Ann Miller, Dawid Panek, Joseph Park, Andrew Partridge, Joanna Pencakowski, James Scrace, Stephanie Sinden, Maria Taboada, Jai Watts, Daniela Yaneva

日期
2020 - ongoing

地点
Milton Keynes, UK

Site Area
10 712.33 m²

层数
32 + 2-storey podium

Services Engineer
MTT Ltd

Structural Engineer
Meinhardt (UK) Ltd

Fire Consultant
The Fire Surgery

Landscape Consultant
Spacehub

Lighting Consultant
Speirs Major

项目主持人
Andrew Partridge

项目介绍
English
Français

项目主持人
Andrew Partridge

项目介绍
English
Français